
This new condominium in Johor Bahru, houses a TNB electric power room at the ground floor and a car park on the 1st floor. Several cracks had appeared on the new construction and the owner was worried for water tightness and also protection of the concrete against wear from vehicles moving and swerving
CWS100 was chosen for three reasons.
- 2.2mm crack sealing ability
- Long-term waterproofing
- Concrete protection, as it hardens the concrete to Grade 9 of Mohs scale (higher than granite), protecting it from mechanical abrasion and wear.