Ice Factory, in Muara – Brunei

Factory rooftop now waterproofed for life, after failure of previous solutions

The Ice Factory rooftop needed re-waterproofing, after failure of previous solutions.

CWS100 was chosen for:

  • Life-long, problem-free waterproofing, with no need for future re-application.
  • Concrete hardening up to Grade 9 of Moh’s scale, therefore cancelling the need for protective screed
Scroll to Top